Navin’s Starwood Towers 3.0

Welcome to a blissful living at Navin’s Starwood Towers 3.0. Just 15 minutes from Velachery, this community offers an upscale lifestyle loaded with conveniences, leisure indulgences and world class amenities with acres of greenery around. Spread across 9.85 acres of serenity and calmness Navin’s Starwood Towers is set at the confluence of Velachery, Sholingnallur (OMR) & Tambaram. Schools, Colleges, Hospitals, IT parks and Malls are a short drive away. Navin’s Starwood Towers 3.0 is built on basement+ stilt + 21 floors comprising 588 elegantly designed 2 BHK homes across two towers Maple & Cedar.

project banner

Apartment

2 BHK

project banner

Project Status

Ongoing

project banner

AREA

877-1285 sq.ft

project banner

Rera No

TN/01/ Building/ 0245/2022

project banner

Location

Medavakkam

project banner

Walkthrough Video


AMENITIES

Floor Plans

Gallery

Specifications

Structure

Seismic Zone III compliant RCC wall structure using latest MIVAN formwork technology

Walls

RCC walls

Doors

PIN controlled smart door lock of reputed make. Teak wood framed main door with designer flush doors. Other doors with good quality

Windows

Good quality UPVC sliding windows

Flooring

Double charged vitrified tile flooring inside the flat

Toilets

Ceramic tile flooring and designed wall dadoing up to 7’ht Fittings – Kohler, Jaguar or equivalent

Water Supply

Bore well for tapping ground water ,Sump to store water with pumping arrangements

Lifts

3 Nos. of 13 passenger and 1 no. of 15 passenger automatic SS lifts in each block of Mitsubishi brand

LOCATION


ADVANTAGE

Arun Hospital

7 mins

V Care

12 mins

Gleneagles Global Health City

14 mins

New Life Hospital

15 mins

Avinash Hospitals Pvt. Ltd

18 mins

Bethesda Hospital

19 mins

Dr. Kamakshi Memorial Hospital

21 mins

Ravindra Bharathi Global School

4 mins

Global Rabbee Play School

7 mins

Vidhya Matric Higher Secondary School

7 mins

Zigma Matriculation School

18 mins

Mohammed Sathak College

9 mins

Asan College Visual Communication, Asan Memorial College of Arts & Science

10 mins

The Quaide Milleth College for Men

10 mins

SIVET College

11 mins

New Prince Shri Bhavani College of Engineering & Technology

13 mins

Jeppiaar Engineering College

23 mins

The Marina Mall

27 mins

Phoenix Marketcity

28 mins

Arun Hospital

7 mins

V Care

12 mins

Gleneagles Global Health City

14 mins

New Life Hospital

15 mins

Avinash Hospitals Pvt. Ltd

18 mins

Bethesda Hospital

19 mins

Dr. Kamakshi Memorial Hospital

21 mins

Ravindra Bharathi Global School

4 mins

Global Rabbee Play School

7 mins

Vidhya Matric Higher Secondary School

7 mins

Zigma Matriculation School

18 mins

Mohammed Sathak College

9 mins

Asan College Visual Communication, Asan Memorial College of Arts & Science

10 mins

The Quaide Milleth College for Men

10 mins

SIVET College

11 mins

New Prince Shri Bhavani College of Engineering & Technology

13 mins

Jeppiaar Engineering College

23 mins

The Marina Mall

27 mins

Phoenix Marketcity

28 mins

Site Progress

Constructions Updates

Follow the month-on-month progress at site through our latest photographs.

Flat Main flooring & Putty work

Flat Main flooring & Putty work

Joineries work

Joineries work

Corridor False Ceiling work & Putty finish

Corridor False Ceiling work & Putty finish

Toilet Tile Work

Toilet Tile Work

Structural work completed

Structural work completed

Common Area False Ceiling

Common Area False Ceiling

Terrace Completion

Terrace Completion

Balcony Handrail

Balcony Handrail

Toilet Wall & Floor Tile Work

Toilet Wall & Floor Tile Work

Main Flooring Tile & Main Door Frame Work

Main Flooring Tile & Main Door Frame Work

External Texture Work

External Texture Work

UPVA Window Work

UPVA Window Work

UPVA Sliding Door

UPVA Sliding Door

Toilet Wall & Floor Tile Work

Toilet Wall & Floor Tile Work

Main Flooring Tile & Main Door Frame Work

Main Flooring Tile & Main Door Frame Work

Main Door Frame & Shutter Fixing

Main Door Frame & Shutter Fixing

Balcony Grill & UPVC French Window

Balcony Grill & UPVC French Window

Toilet Wall & Floor Tile Work

Toilet Wall & Floor Tile Work

Putty - 1st Coat Work

Putty - 1st Coat Work

External Elevation - Texture Finish Work

External Elevation - Texture Finish Work

Toilet Wall Tile & Floor Tile Work

Toilet Wall Tile & Floor Tile Work

Balcony Grill & UPVC French Window

Balcony Grill & UPVC French Window

Corridor False Ceiling Flooring Work

Corridor False Ceiling Flooring Work

Staircase Handrail

Staircase Handrail

Main Flooring Tile Work

Main Flooring Tile Work

External Elevation – Texture Finish Work

External Elevation – Texture Finish Work

Toilet Wall Tile & Floor Tile Work

Toilet Wall Tile & Floor Tile Work

Balcony Grill & UPVC French Window

Balcony Grill & UPVC French Window

Staircase Handrail

Staircase Handrail

Site progress update 5-3
Main Flooring Tile Work

Main Flooring Tile Work

External Elevation – Texture Finish Work

External Elevation – Texture Finish Work

Service Lift Installation Work Completed

Service Lift Installation Work Completed

Basement Grano Flooring Work Completed

Basement Grano Flooring Work Completed

Passenger Lift Installation –Work in Progress

Passenger Lift Installation –Work in Progress

In Terrace - Flooring Tiles Laying Work in Progress

In Terrace - Flooring Tiles Laying Work in Progress

Electrical Cable Pulling Work in Progress

Electrical Cable Pulling Work in Progress

Door Fixing Work in Progress

Door Fixing Work in Progress

Flooring Tiles Laying Work in Progress

Flooring Tiles Laying Work in Progress

Site progress update 6-7
Site progress update 6-8
Electrical Work in Progress

Electrical Work in Progress

Passenger Lift Installation –Work in Progress

Passenger Lift Installation –Work in Progress

Terrace Tiling Work Completed

Terrace Tiling Work Completed

Waterproofing Work Completed

Waterproofing Work Completed

Basement Soil, Rainwater Line, Metro Water main  Line work

Basement Soil, Rainwater Line, Metro Water main Line work

Plumbing Work in Progress

Plumbing Work in Progress

Main door Frame Fixing 95% Completed

Main door Frame Fixing 95% Completed

Main Flooring & Toilet Tiles Laying Work is Completed for Booked all Flats

Main Flooring & Toilet Tiles Laying Work is Completed for Booked all Flats

External Painting Work in Progress

External Painting Work in Progress

External Texture & Painting Work in Progress

External Texture & Painting Work in Progress

Passenger Lift Installation – Work in Progress -Will be Completed by Mid of Oct'2024

Passenger Lift Installation – Work in Progress -Will be Completed by Mid of Oct'2024

Joineries Work

Joineries Work

Main Flooring  & Toilet Tiles Laying Work is Completed for Booked Flats = 89 Flat

Main Flooring & Toilet Tiles Laying Work is Completed for Booked Flats = 89 Flat

South Side Elevation- External Texure and Paint Work is Progress

South Side Elevation- External Texure and Paint Work is Progress

Site progress update 8-4
External Texture & Painting Work in Progress

External Texture & Painting Work in Progress

Paver Block Laying Work in Progress

Paver Block Laying Work in Progress

Service Lift Work Completed

Service Lift Work Completed

Passenger Lift Installation Work in Progress and will be Completed by Mid Nov 2024

Passenger Lift Installation Work in Progress and will be Completed by Mid Nov 2024

OTS Covering Work in Progress

OTS Covering Work in Progress

Basement Painting Work - 95% Completed

Basement Painting Work - 95% Completed

Stilt Floor Painting Work - 95% Completed

Stilt Floor Painting Work - 95% Completed

Plumbing Work in Progress

Plumbing Work in Progress

Electrical Work in Progress

Electrical Work in Progress

Main door Frame Fixing

Main door Frame Fixing

Main Flooring  & Toilet Tile Laying Work Completed for Booked Flats = 94 Flat

Main Flooring & Toilet Tile Laying Work Completed for Booked Flats = 94 Flat

East Side Elevation- External texure and Painting Completed

East Side Elevation- External texure and Painting Completed

External Texture & Painting Work in Progress

External Texture & Painting Work in Progress

Gas Bank Connection Work Completed

Gas Bank Connection Work Completed

Pipe Line Gas 100 Flats Completed

Pipe Line Gas 100 Flats Completed

Typical  Floor Light Fittings 100% Completed

Typical Floor Light Fittings 100% Completed

Carparking Marking - 100% Completed

Carparking Marking - 100% Completed

Painting & Lighting - 100% Completed

Painting & Lighting - 100% Completed

Stilt Floor

Stilt Floor

Stilt Floor Painting & Lighting - 100% Completed

Stilt Floor Painting & Lighting - 100% Completed

Site progress update 10-7
Metering Panel - EB Room

Metering Panel - EB Room

STILT FLOOR  PAINTING & LIGHTING – 100% COMPLETED

STILT FLOOR PAINTING & LIGHTING – 100% COMPLETED

STILT FLOOR  PAINTING & LIGHTING – 100% COMPLETED

STILT FLOOR PAINTING & LIGHTING – 100% COMPLETED

STILT FLOOR

STILT FLOOR

STILT FLOOR

STILT FLOOR

BASEMENT   PAINTING & LIGHTING  – 100% COMPLETED CARPARKING MARKING – 100% COMPLETED

BASEMENT PAINTING & LIGHTING – 100% COMPLETED CARPARKING MARKING – 100% COMPLETED

BASEMENT   PAINTING & LIGHTING  – 100% COMPLETED CARPARKING MARKING – 100% COMPLETED

BASEMENT PAINTING & LIGHTING – 100% COMPLETED CARPARKING MARKING – 100% COMPLETED

Typical Floor Corridor  Light fittings  100% Completed

Typical Floor Corridor Light fittings 100% Completed

Site progress update 14-1
Piped Line Gas  Kitchen Copper Pipe , Valve & Meter Fixing Work – 100 Flats completed

Piped Line Gas Kitchen Copper Pipe , Valve & Meter Fixing Work – 100 Flats completed

Frequently Asked Questions

The total land extent of Starwood Towers is 9.85 acres (all phases together)

Basement + Stilt + 21 floors

Each floor consists of 14 apartments.

The source of water is ground water that will be tapped with bore wells.

Yes. We have separate sumps.

A sewage treatment plant (STP) will be provided as drainage facility.

Grey water treatment will also be provided for treating kitchen waste water.

Each block contains - 
3 Nos. of 13-passenger lift  
One No. 15-passenger/ service lift

All blocks are fully compounded with respective gates for entry & exit. We provide manned security 24/7 along with CCTV surveillance.

Refer ‘Blue chip safety'

Through self-cleansing SS garbage chutes available at every floor

Yes

Current expected date of completion of Maple block is end of 2024

18500 Sq. ft

Phase III – RERA registered:  
Maple - TN/01/Building/0245/2022

Our Ongoing Projects

logo
WhatsAppCall